Skip to content

 

 

  • Home
  • Themes & Outputs
    • Theme One: Better Investment Decisions
      • Review of Condition Assessment Techniques for Pressure Pipes for Water
      • Code of Practice for Three-Waters Pipe Assets
      • Holistic Decision-making Framework for Three Waters
      • National Pipe Data Portal (NPDP)
      • Urban Flood Digtial Twin
      • Strategic Review of Procurement of Three-Waters
      • Classifying Sewer Pipe Deterioration
    • Theme Two: Digital Engineering
      • Artificial Intelligence Processes to Code Compliance Checking
      • Strategic Review of Digitisation of The Building Industry
      • Location Data Standards
      • BIMSAFE
      • BIM to BAM – Building Information Management to Building Asset Management
      • BIM Related Case Studies
    • Theme Three: Fit For Purpose
      • Strategic Review of Design and Construction of Non-Structural Elements
      • Non-structural Elements Experimental Testing
      • Testing Facility for Non-Structural Elements
    • Theme Four: Low Carbon and Climate Resilient Infrastructure
  • About Us
    • Advisory Board
    • Meet Our Team
  • Latest Research
  • News
  • Contact Us
  • Quake Centre

BIM Related Case Studies

NLP Approaches to align Construction Classification Systems

Posted on June 14, 2022July 4, 2022 by Greg.Preston

Classification systems are an essential part of the construction industry. They are used for managing project information, specifying building products, building information modelling and more. Since there is no common

Read More
BIM Related Case Studies

Continuous Improvement Working Group (CIWG)

Posted on June 9, 2022June 30, 2022 by Greg.Preston

As part of a proposed new build at the University of Canterbury (UC), BIP worked closely with the UC’s Facilities Management (UCFM) team, the design team and UC’s appointed BIM

Read More
BIM Related Case Studies

Contact Us

        027-262-2629

        greg.preston@canterbury.ac.nz

        63 Creyke Road, Ilam, Christchurch 8041